Research on the Quality Post Evaluation System of the Yueqing Bay Bridge Project
In order to reasonably control the project quality of the Yueqing Bay Bridge and its connection engineerings,a re-search on the quality post evaluation system is proposed.The research analyzes the management quality,technical quality and project benefit.The construction management ability,construction technology level and project operation benefit are comprehen-sively considered through the whole project.The results presents that the Yueqing Bay Bridge and its connection engineer-ings show the excellent performance in all three aspects.Project evaluation experience can provide reference for the construction and management of similar engineering projects.
post evaluation systemconstruction qualitymanagement qualitytechnical qualityproject benefit