首页|乐清湾大桥工程质量后评估体系研究

乐清湾大桥工程质量后评估体系研究

扫码查看
为合理把控乐清湾大桥及接线工程的项目质量,开展工程质量后评估体系研究,对管理质量、技术质量和项目效益进行分析,综合考虑施工前中后期的建设管理能力、施工技术水平及项目经营效益.评估结果表明:乐清湾大桥及接线工程在管理质量、技术质量及项目效益方面均达到优秀水平.项目评估经验可为类似工程项目建设及管理提供参考.
Research on the Quality Post Evaluation System of the Yueqing Bay Bridge Project
In order to reasonably control the project quality of the Yueqing Bay Bridge and its connection engineerings,a re-search on the quality post evaluation system is proposed.The research analyzes the management quality,technical quality and project benefit.The construction management ability,construction technology level and project operation benefit are comprehen-sively considered through the whole project.The results presents that the Yueqing Bay Bridge and its connection engineer-ings show the excellent performance in all three aspects.Project evaluation experience can provide reference for the construction and management of similar engineering projects.

post evaluation systemconstruction qualitymanagement qualitytechnical qualityproject benefit

封露、张璐

展开 >

浙江省交通工程管理中心,杭州 310023

浙江省交通运输科学研究院,杭州 310023

后评估体系 工程质量 管理质量 技术质量 项目效益

2024

现代交通技术
江苏省交通科学研究院

现代交通技术

影响因子:0.431
ISSN:1672-9889
年,卷(期):2024.21(2)
  • 6