Study on Key Construction Techniques for the Main Bridge of Luohe Super Major Bridge
Based on the project of Luohe Super Major Bridge,a systematic study is conducted on the key construction tech-niques of high pier and long-span continuous rigid frame bridge.During the construction process,the relevant technical a-chievements such as mass concrete temperature control,rapid capping of hollow pier,non counterweight construction of cast-in-situ section of high pier side span and so on can provide reference for the construction of similar high pier and long-span continuous rigid frame.