Research on the Interconnection and Interworking Scheme between CBTC and CTCS-2 of Metro Rail Transit
According to the operation requirements of cross-signal system interconnection and interworking between CBTC system and CTCS-2 system of metro rail transit in metropolitan area,the prerequisite of interconnection and interworking is preliminarily analyzed.Four interconnection and interworking schemes of"double sets of ground equipment scheme""compatible scheme of ground equipment""double sets of vehicle equipment scheme"and"integrated vehicle equipment scheme"are proposed to analyze and compare the engineering investment,engineering implementation,operation and maintenance.It focuses on the central level and station level implementation schemes for cross-signal system interconnection and interworking,analyzes the switching process of CBTC and CTCS-2,and gives a recommended scheme that conforms to the recent status quo and trend of technology development in the field of signal system.
metropolitan areaCTCS-2CBTCinterconnection and interworking