某L河固床坝坝后消能设施加固设计研究
Study on the reinforcement design of energy dissipation facilities at the back of a fixed bed dam in River L
勾建朋 1傅柯1
作者信息
- 1. 西安黑河供水有限责任公司黑河输水渠道管理分公司,西安 710061
- 折叠
摘要
文章以某L河固床坝坝后消能设施加固设计研究保障城市平稳供水为背景,在分析工程地质、施工导流等因素的基础上,通过水力学计算分析,提出了最佳设计方案,最终取得良好的效果,不仅对同类型固床坝坝后消能设施加固设计可以起到参考借鉴,也对于工程管理部门日常技术管理工作提供参考.
Abstract
Based on the background of the research on the reinforcement design of energy dissipation facilities at the back of a fixed bed dam in River L to ensure the stable water supply of the city,on the basis of the analysis of en-gineering geology,construction diversion and other factors,the optimal design scheme is proposed through hydraulic calculation and the analysis,and finally good results are achieved.It can not only serve as a reference for the rein-forcement design of energy dissipation facilities for the same type of fixed bed dam,but also provide reference for the daily technical management of the engineering management department.
关键词
输水/固床坝/消能/加固/设计/研究Key words
Water delivery/Solid bed dam/Energy dissipation/Reinforce/Design/Study引用本文复制引用
出版年
2024