首页|某L河固床坝坝后消能设施加固设计研究

某L河固床坝坝后消能设施加固设计研究

扫码查看
文章以某L河固床坝坝后消能设施加固设计研究保障城市平稳供水为背景,在分析工程地质、施工导流等因素的基础上,通过水力学计算分析,提出了最佳设计方案,最终取得良好的效果,不仅对同类型固床坝坝后消能设施加固设计可以起到参考借鉴,也对于工程管理部门日常技术管理工作提供参考.
Study on the reinforcement design of energy dissipation facilities at the back of a fixed bed dam in River L
Based on the background of the research on the reinforcement design of energy dissipation facilities at the back of a fixed bed dam in River L to ensure the stable water supply of the city,on the basis of the analysis of en-gineering geology,construction diversion and other factors,the optimal design scheme is proposed through hydraulic calculation and the analysis,and finally good results are achieved.It can not only serve as a reference for the rein-forcement design of energy dissipation facilities for the same type of fixed bed dam,but also provide reference for the daily technical management of the engineering management department.

Water deliverySolid bed damEnergy dissipationReinforceDesignStudy

勾建朋、傅柯

展开 >

西安黑河供水有限责任公司黑河输水渠道管理分公司,西安 710061

输水 固床坝 消能 加固 设计 研究

2024

西藏科技
西藏科技信息研究所

西藏科技

影响因子:0.202
ISSN:1004-3403
年,卷(期):2024.46(8)