Analysis of a Remote Section Reset Control Circuit
In urban rail transit lines that use axle counting systems as section occupancy inspection equipment,there are two ways to achieve remote section reset:one is segment pre reset,and the other is segment direct reset.General circuits only have one reset method and cannot have both.This article is based on the TAZ Ⅱ/S295+JC axle count-ing system produced by Shenzhen Keanda Electronic Technology Co.,Ltd.provide a design proposal for a control cir-cuit that combines two remote reset functions:section pre reset and section direct reset.Other similar engineering constructions can be used for reference.
axle counter equipmentsection resetmechanism of mutual disconnection