中国港湾建设2024,Vol.44Issue(4) :69-72.DOI:10.7640/zggwjs202404015

大曲率沉管隧道安装测控技术研究

Measurement and control technology for installation of large curvature immersed tunnels

徐良 田芷旭
中国港湾建设2024,Vol.44Issue(4) :69-72.DOI:10.7640/zggwjs202404015

大曲率沉管隧道安装测控技术研究

Measurement and control technology for installation of large curvature immersed tunnels

徐良 1田芷旭1
扫码查看

作者信息

  • 1. 中交一航局第二工程有限公司,山东 青岛 266071;天津市水下隧道建设与运维技术企业重点实验室,天津 300461
  • 折叠

摘要

大连湾海底隧道曲线沉管为国内最大曲率,为实现大曲率沉管的高精度安装定位与轴线控制,需对原有直线段沉管安装测控技术进行改进与优化.文章主要针对沉管标定、浮运安装测控系统与沉管线形拟合3部分对直线与曲线沉管安装测控的不同点与相应优化方案进行研究,并在E14-E18管节安装过程中进行实践验证.最终实现曲线管节高精度安装,至E18管节尾端轴偏15 mm,为最终接头顶推提供有利条件.

Abstract

The curved immersed tube of the Dalian Bay immersed tunnel is the largest curvature in China.In order to achieve high-precision installation positioning and axis control of large curvature immersed tubes,it is necessary to improve and optimize the original measurement and control technology for the installation of straight section immersed tubes.In this paper,the differences and corresponding optimization schemes of straight and curved immersed tube installation measurement and control were mainly studied in three parts:immersed tube calibration,floating transportation installation measurement and control system,and immersed tube linear fitting,and the practice was verified in the installation process of E14-E18 pipe segments.The final high-precision installation of the curved pipe joint was achieved,with an axis deviation of 15 mm to the tail end of the E18 pipe segment,providing favorable conditions for the closure joint pushing.

关键词

沉管标定/安装/大曲率/测控系统

Key words

calibration of immersed tubes/installation/large curvature/measurement and control system