人工筑岛位移变形是一个长期的发展过程,连接人工岛与桥梁的岛桥结合部对人工岛位移变化尤为敏感.基于深中通道西人工岛岛桥结合部岛壁结构、非通航孔桥施工及监测情况,对岛桥结合部岛壁、桥梁位移变形发展趋势进行分析,得到形成人工岛岛桥结合部位移变形特点,对类似工程设计、施工提供重要参考依据.
The displacement deformation of artificial islands is a long-term development process,and the island-bridge junction connecting the artificial island and the bridge is particularly sensitive to the displacement changes of the artificial island.Based on the structure of the island wall at the island-bridge junction in the west artificial island of the Shenzhen-Zhongshan Link,as well as the construction and monitoring of non-navigable bridges,this paper analyzes the development trend of displacement deformation of the island wall and the bridge at the island-bridge junction,and obtains the characteristics of displacement deformation at the junction of the artificial island and bridge.This provides important reference for similar engineering design and construction.

Shenzhen-Zhongshan Link artificial islandisland-bridge junctiondisplacement deformationisolation retaining wallconstruction timing

樊文策、郭立栋、杨润来、朱义鑫

展开 >

中交一航局第一工程有限公司,天津 300456

中交第一航务工程局有限公司,天津 300461

中交一航局第三工程有限公司,辽宁 大连 116083

深中通道人工岛 岛桥结合部 位移变形 隔离挡墙 施工时机