霞浦深厚软弱土层核电排水隧洞工程设计关键因素及对策

Key factors and countermeasures for the design of Xiapu Nuclear Power Plant drainage tunnel project in deep soft soil area

扫码查看
规划新建核电厂建设厂址条件日益复杂,其排水隧洞工程建设中需综合考虑软弱土层、高水压、排水口实施等因素带来的影响,并在工程建设前期规划中合理布置隧洞线路与选择结构方案.为此采用工程类比法对同类工程进行调查研究,分别对隧洞不同埋深、不同衬砌结构方案等进行比选,对影响霞浦核电排水隧洞工程建设的部分因素提出应对措施,并据此确定了建设方案,为工程建设的顺利进行奠定了基础.
The site conditions for planning the construction of new nuclear power plants are becoming increasingly complex.During the construction of their water discharge tunnels,it is necessary to comprehensively consider the impacts of soft soil,high water pressure,and the implementation of the water discharge outlet in order to reasonably plan tunnel routes and select structural schemes in the early stages.Therefore,an engineering analogy method has been adopted to investigate and study similar projects,comparing and selecting different tunnel burial depths and lining structure schemes.Measures were proposed to address some factors that affect the construction of the Xiapu Nuclear Power Plant drainage tunnel project,and a construction plan was determined based on this,laying the foundation for the smooth progress of the project construction.

soft soilshield tunnelhigh water pressureundersea drainage tunnel

燕伟、叶雅图、董玉国、陈晓磁、王建仓、刘欢、刘玲、陈娟娟

展开 >

华能霞浦核电有限公司,福建 宁德 355100

中交第四航务工程勘察设计院有限公司,广东 广州 510290

软土 盾构隧道 高水压 海底排水隧洞