首页|高速公路天然砂砾石路基填方压实施工技术研究

高速公路天然砂砾石路基填方压实施工技术研究

扫码查看
为规范路基施工,以某高速公路改建工程项目为例,开展天然砂砾石路基填方压实施工技术研究.施工前,应做好路基原地面的清表、回填;采用分层填筑的方式进行填方施工.施工中,应注意做好填筑层含水量的控制;计算冲击机械在施工中的冲击能、冲击速度,设计冲击压实施工.实例应用实验结果表明:设计的施工方法应用效果良好,可以有效提高复杂地质环境下的路基填方压实施工质量,使施工后路基各项指标符合质量要求.
Research on the construction technology of natural sand and gravel roadbed filling and compaction for expressway
To standardize roadbed construction,taking a highway reconstruction project as an example,research was conducted on the compaction construction technology of natural gravel roadbed filling.Before construction,the original ground of the roadbed should be cleaned and backfilled;using layered filling method for filling construction,pay attention to controlling the water content of the filling layer during the construction process;calculate the impact energy and speed of impact machinery during construction,and design impact compaction construction.The experimental results of practical application show that the designed construction method has good application effect,and this method can effectively improve the compaction construction quality of roadbed filling in complex geological environments,so that all indicators of the roadbed after construction meet the quality requirements.

expresswayconstruction techniquecompactionfillsubgradenatural sand and gravel

牙地卡尔·吾买尔

展开 >

新疆交投建设管理有限责任公司,新疆 乌鲁木齐 830000

高速公路 施工技术 压实 填方 路基 天然砂砾石

2024

中国高新科技
中华预防医学会,国家食品安全风险评估中心

中国高新科技

ISSN:
年,卷(期):2024.(1)
  • 6