首页|风力发电机预应力锚栓笼组装控制与案例分析

风力发电机预应力锚栓笼组装控制与案例分析

扫码查看
文章针对风力发电机组预应力锚栓笼安装过程中的典型问题进行深入分析,从多个角度揭示问题成因及采取合理处置方案,旨在提高风力发电建设施工质量,为类似施工项目提供参考。
Assembly control and case analysis of prestressed anchor cage for wind turbines
This article conducts an in-depth analysis of typical problems during the installation of prestressed anchor cages for wind turbines,revealing the causes of the problems from multiple perspectives and adopting reasonable disposal plans,providing reference for similar construction projects,aiming to improve the construction quality of wind power generation.

wind power generationanchor bolt cageassembly control

安永乐

展开 >

北京国电德胜工程项目管理有限公司,北京 100032

风力发电 锚栓笼 组装控制

2024

中国高新科技
中华预防医学会,国家食品安全风险评估中心

中国高新科技

ISSN:
年,卷(期):2024.(2)
  • 2