文章对新疆东方希望有色金属有限公司自备发电机组协调控制系统进行全面升级,采用引进APC控制系统的方式,以解决国产亚临界汽包机组主要参数滞后性强的问题,以及机组运行过程中扰动的多样性和不可预知性等问题,满足新形势"双碳"排放改造及新能源接入后电网的负荷需求。
APC project transformation of captive power plant units
A comprehensive upgrade is carried out to the coordination control system of the self-provided generator set of Easthope Hope Nonferrous Metals Co.,Ltd.By introducing the APC control system which has solved the problem of main parameter lag in domestic subcritical steam drum units,as well as the diversity and unpredictability of disturbances during unit operation,it is able to meet the new situation of"dual carbon"emission transformation and the load demand of the electrified wire netting after the integration of new energy.

isolated network operationcoordinated controlAPC(Advanced Process Control)project retrofitFCB(Fast Cut Back)automatic adjustment of large delay characteristics"dual carbon"transformation

张伟

展开 >

新疆东方希望有色金属有限公司,新疆 昌吉 831700

孤网运行 协调控制 APC(先进过程控制)项目改造 FCB 大时延特性的自动调节 "双碳"改造