随着轨道交通建设的发展,已建地铁车站对规划线路区间隧道下穿的预留有多种形式.文章结合成都不同的车站预留下穿条件和下穿方式进行研究与探讨,对直径 8.3m盾构隧道下穿既有运营车站的监测值进行归纳总结,对车站预留下穿条件进行分析,并提出合理化建议,为后续隧道下穿既有运营车站的安全控制及车站预留规划隧道下穿条件提供参考.
Research on the impact of tunnel undercrossing existing metro stations and analysis of station reserved underpass conditions
With the development of rail transit construction,there are various forms of reservation for tunnel underpass in planned line sections at existing metro stations.This article studies and explores the reserved underpass conditions and underpass methods for different stations in Chengdu.Summarize the monitoring values of the 8.3m diameter shield tunnel passing through existing metro stations.Analyze the reserved underpass conditions at the station and propose reasonable suggestions.Provide reference for the safety control of tunnel underpass through existing operating stations and the reserved planning of tunnel underpass conditions for stations in the future.

tunnel engineeringunderpass metro stationsreserved tunnel underpass conditions at stationsredistribution of station internal forcessettlement of existing lines

张庆

展开 >

中国中铁二院工程集团有限责任公司,四川 成都 610031

隧道工程 下穿地铁车站 车站预留隧道下穿条件 车站内力重分布 既有线沉降

2024

中国高新科技
中华预防医学会,国家食品安全风险评估中心

中国高新科技

ISSN:
年,卷(期):2024.(5)
  • 5