Optimization of prefabricate beam and slab installation technology scheme in subway construction
Based on the erection of the bridge slab in the second section of the civil construction of the first phase of the construction contract of Hangzhou Metro Line 10,this paper summarizes the erection technical scheme of 22.9m long beam slab in the subway construction by comparing and analyzing the erection method and the actual construction situation.
Hangzhou metrosubway constructionbeam and slab installationtechnical solution