Research on the application of vacuum preloading foundation treatment construction technology
This project consists of a factory building,a distribution center,two warehouses,a research and development office building,a shift dormitory,a platform ramp and station building,a guard room,and a garbage shed.Considering the functional requirements of the site construction,the impact on surrounding buildings,and geological conditions,the land used for this project is treated with a partitioned design foundation.Most of the plot on the site is reinforced with vacuum combined loading(water covering)preloading.The triangular plot of the parking space on the east side is reinforced with replacement and rolling.The north and west sides of the east slope are reinforced with cement soil mixing piles.