Differences in predicting soil erosion in construction production projects
Construction production project and construction project of soil erosion prediction methods are basically the same but also have a faint difference,difference mainly predict time,determine the area of soil erosion and soil erosion modulus of the three important aspects,due to its weak sex is often ignored by many scholars.In this paper,from the above three sides facing the construction of production projects of s soil erosion prediction study,analyzes the commonness and individuality,and the common problems in the preparation of practice and through the instance.
construction production projectsoil erosion predictionsoil erosion areasoil erosion modulus