中国高新科技2024,Issue(7) :51-52,85.DOI:10.13535/j.cnki.10-1507/n.2024.07.13

路桥工程建设中路基路面施工技术要点

Technical points of roadbed and pavement construction in road and bridge construction

徐梦新 王鹏
中国高新科技2024,Issue(7) :51-52,85.DOI:10.13535/j.cnki.10-1507/n.2024.07.13

路桥工程建设中路基路面施工技术要点

Technical points of roadbed and pavement construction in road and bridge construction

徐梦新 1王鹏1
扫码查看

作者信息

  • 1. 德州市公路事业发展中心夏津分中心,山东 德州 253200
  • 折叠

摘要

路基和路面施工是决定路桥工程建设质量的两个关键环节.在路基施工中,需要从路基土方开挖、路基排水和填方压实等环节加强施工管理;在路面施工中,需要从路面材料的质量控制、路面材料的摊铺管理、路面材料的压实控制 3 个方面把控施工技术要点.通过树立精细化的管控理念,才能切实提高路桥工程建设质量,提高行车舒适性.

Abstract

Roadbed and pavement construction are the two key links that determine the construction quality of road and bridge engineering.In subgrade construction,it is necessary to strengthen construction management from subgrade excavation,subgrade drainage and fill compaction.In pavement construction,it is necessary to control the key points of construction technology from three aspects:quality control of pavement materials,paving management of pavement materials and compaction control of pavement materials.By establishing a refined control concept,we can effectively improve the construction quality of road and bridge projects and improve driving comfort.

关键词

路桥工程/路基排水/振动碾压/路面施工

Key words

road and bridge engineering/roadbed drainage/vibration rolling/pavement construction

引用本文复制引用

出版年

2024
中国高新科技
中华预防医学会,国家食品安全风险评估中心

中国高新科技

ISSN:
参考文献量5
段落导航相关论文