The project is a new industrial building of Haier Group,which integrates manufacturing,research and development,design,regional headquarters and R&D facilities.Construction area of 89000m2,a total of 8 floors,the building is defined as a Class C high-rise plant.Based on the actual practice,this paper introduces the design points of the water supply,drainage and fire protection system of the project to ensure that the design is reasonable,the operation is reliable,and the functional requirements of buildings and personnel safety requirements are met.It provides reference for the future design of such projects.
high-rise plantwater supply systemdrainage systemindoor and outdoor fire hydrant systemsprinkler system