Research and application of traffic in the construction of concrete high dam
The concrete construction characteristics of the dam of Baihetan Hydropower Station are fully studied to solve the traffic problem of the concrete construction of the dam,reduce the construction strength of the construction personnel,facilitate the management of the warehouse surface,and provide reference for similar projects.