In view of the large number of applications of BIM model in coal mine construction projects,its goal is to overcome the challenges of lack of data accuracy,lack of information and lack of professional collaboration difficulties in traditional design methods.The core goal of this study is to improve the geometric accuracy,attribute accuracy and overall quality of BIM models by adopting a systematic approach to ensure the high accuracy and reliability of the models.