Research on construction technology of line change for Wufengshan Yangtze River crossing
With the rapid economic development of Jiangsu Province,energy demand has increased sharply.The limited cross-river lines have been unable to meet the rapidly increasing demand for electric energy,and it is difficult to build a new large-span project.Therefore,the method of using the original transmission channel to replace the conductor with a larger transmission capacity,and then improving the transmission capacity of electric energy has become one of the best choices to solve the energy demand.Based on this,the paper takes the Wufeng Mountain Yangtze River crossing line change project as an example,discusses from the technical level,for the reference of relevant personnel.
the great crossing of the Yangtze Riverchange the lineoverhead lineFive peaks Mountainconstruction technique