首页|地面钻探技术在断层勘查中的应用

地面钻探技术在断层勘查中的应用

扫码查看
根据里必矿首盘区地面以往三维地震勘探成果,设计首采3101工作面东侧约90m发育DF2断层,为了进一步对里必矿首盘区中部的DF2断层进行验证勘探,确保矿井的安全生产.采用地面钻探技术,对里必矿断层进行了勘查,施工了2个钻孔(钻孔DF2-1、DF2-2),共计1 700m,并在3煤、15煤顶、底板30m内取样,查明验证了DF2断层的发育特征、产状、落差等情况.根据两孔内煤层重复落差情况对比及岩性特征、标志层、层间距等综合判断,该断层为逆断层,结合以往地表三维地震勘探资料,判断该断层走向N10°E,倾向N80°W.上盘位于西侧,下盘位于东侧,上盘抬升、下盘下降,地层及煤层发生挤压,断层倾角25°左右,落差在31~34m.根据钻孔水文简易观测情况,结合矿区水文地质条件、钻孔煤层顶底板地层岩性特征、断层面岩性特征,综合研判DF2断层在该施工区域内不具备导水性条件,断层导水性对煤层开采影响较小;查明了可采煤层的厚度、结构,并对DF2断层附近地层层位、厚度进行了划分,研究成果为矿井安全生产提供地质保障.
Application of Surface Drilling Technology in Fault Exploration
According to the previous 3D seismic exploration results of the first panel of Libi Mine,it was found that a DF2 fault developed approximately 90m east of the first mining 3101 working face.In order to further verify and explore the DF2 fault in the central part of the first panel and ensure the safety of the mine production,surface drilling technology was used to construct two boreholes(DF2-1 and DF2-2),totaling 1 700m,and samples were taken within 30 meters of the roof and floor of coal seams 3 and 15 to identify and verify the development characteristics,occurrence,and drop of the DF2 fault.Based on the comparison of the drop of coal seams in the two boreholes,as well as the comprehensive judgment of lithological characteristics,marker layers,and interlayer spacing,this fault is a reverse fault.Combined with previous 3D seismic exploration data on the surface,it is determined that the fault has a strike of N10°E and a dip of N80°W.The hanging wall is located on the west side and the footwall is located on the east side.The lifting of the hanging wall and lowering of footwall cause compression of the strata and coal seams,with a fault inclination angle of about 25 ° and a drop of 31~34m.Based on the observation of borehole hydrology,combined with the hydrogeological conditions of the mining area,the lithological characteristics of the roof and floor strata of the drilling,and the lithological characteristics of the fault plane,it is comprehensively determined that the DF2 fault does not have water conductivity conditions in the construction area.The research provides geological support for the safe production of mines.

surface drilling3D seismic explorationfault exploration

郑丙谦、张先恒

展开 >

山西华冶勘测工程技术有限公司,山西太原 030000

中国冶金地质总局第三地质勘查院,山西太原 030000

地面钻探 三维地震勘探 断层勘查

山西省晋城矿区内勘查区地质资料汇编及煤炭资源调查评价基金

ZMYJKJ-2021-05

2024

中国煤炭地质
中国煤炭地质总局

中国煤炭地质

CSTPCD
影响因子:0.652
ISSN:1674-1803
年,卷(期):2024.36(2)
  • 15