复杂建设条件下越江隧道工程方案的对策研究

扫码查看
随着近几年工程建设条件难度的不断增加,以及工程技术和施工工法的不断进步,使得越江隧道工程方案设计在面临众多边界条件的同时,也具备了相应的工程解决方案.以上海市龙水南路越江隧道工程为例,从建设条件自上而下的系统梳理方式、工程建设难点的系统维度分析和工程对策方案的分析研究步骤等方面,对复杂建设环境下越江隧道工程方案的对策进行分析研究.
Research on Countermeasures for Cross River Tunnel Engineering under Complex Construction Conditions
With the increasing difficulty of engineering construction conditions in recent years,as well as the continuous progress of engineering technology and construction methods,the design of cross river tunnel engineering schemes not only faces numerous boundary conditions,but also has corresponding engineering solutions.Taking the South Longshui Road Cross River Tunnel Project in Shanghai as an example,it analyzes and studies the countermeasures for the Cross River Tunnel Project in a complex construction environment from the aspects of a top-down systematic sorting method of construction conditions,a systematic dimension analysis of construction difficulties,and the analysis and research steps of engineering countermeasures.

complexconstruction conditionscross river tunnelstrategy research

胡佳萍

展开 >

上海隧道工程股份有限公司,上海 200125

复杂 建设条件 越江隧道 对策研究

2024

中国市政工程
上海市城市建设设计研究院

中国市政工程

影响因子:0.358
ISSN:1004-4655
年,卷(期):2024.(1)