中国市政工程2024,Issue(1) :78-81.DOI:10.3969/j.issn.1004-4655.2024.01.017

复杂建设条件下越江隧道工程方案的对策研究

Research on Countermeasures for Cross River Tunnel Engineering under Complex Construction Conditions

胡佳萍
中国市政工程2024,Issue(1) :78-81.DOI:10.3969/j.issn.1004-4655.2024.01.017

复杂建设条件下越江隧道工程方案的对策研究

Research on Countermeasures for Cross River Tunnel Engineering under Complex Construction Conditions

胡佳萍1
扫码查看

作者信息

  • 1. 上海隧道工程股份有限公司,上海 200125
  • 折叠

摘要

随着近几年工程建设条件难度的不断增加,以及工程技术和施工工法的不断进步,使得越江隧道工程方案设计在面临众多边界条件的同时,也具备了相应的工程解决方案.以上海市龙水南路越江隧道工程为例,从建设条件自上而下的系统梳理方式、工程建设难点的系统维度分析和工程对策方案的分析研究步骤等方面,对复杂建设环境下越江隧道工程方案的对策进行分析研究.

Abstract

With the increasing difficulty of engineering construction conditions in recent years,as well as the continuous progress of engineering technology and construction methods,the design of cross river tunnel engineering schemes not only faces numerous boundary conditions,but also has corresponding engineering solutions.Taking the South Longshui Road Cross River Tunnel Project in Shanghai as an example,it analyzes and studies the countermeasures for the Cross River Tunnel Project in a complex construction environment from the aspects of a top-down systematic sorting method of construction conditions,a systematic dimension analysis of construction difficulties,and the analysis and research steps of engineering countermeasures.

关键词

复杂/建设条件/越江隧道/对策研究

Key words

complex/construction conditions/cross river tunnel/strategy research

引用本文复制引用

出版年

2024
中国市政工程
上海市城市建设设计研究院

中国市政工程

影响因子:0.358
ISSN:1004-4655
段落导航相关论文