首页|盾构隧道富余空间综合利用分析及应用

盾构隧道富余空间综合利用分析及应用

Analysis&Application of Comprehensive Utilization of Surplus Space in Shield Tunnels

扫码查看
盾构隧道下部富余空间用作市政管线的通道,提高了盾构空间资源的综合利用率,同时也解决了市政管线建设需求,低碳环保,经济效益好.珠海大道隧道内设置有DN1 200 给水管,预留有高压电力管、通信管通道,结合珠海大道隧道项目,研究市政管线随隧道建设的合规性.重点分析市政管线的工艺布置、进出隧道路由、吊装运输路径、建设时序,提出DN1 200 给水管随盾构主体同步施工,电力电缆后期建设的施工步骤.同时对市政管线随隧道建设的安全性进行分析,给水管采用设置检修阀、排气阀、泄水阀等措施,利用隧道废水排水系统排除管道泄水.最后研究高压电力电缆舱的消防安全保障措施,确保隧道与市政管线的运营安全.
The surplus space below the shield tunnel is used as a passage for municipal pipelines,which improves the comprehensive utilization rate of shield space resources and also solves the needs of municipal pipeline construction.It is low-carbon,environmentally friendly,and has good economic benefits.There is a DN1 200 water supply pipe installed in the Zhuhai Avenue Tunnel,with reserved channels for high-voltage power pipes and communication pipes.In conjunction with the Zhuhai Avenue Tunnel project,the compliance of municipal pipelines with tunnel construction will be studied.Focus on analyzing the process layout,entry and exit tunnel routing,lifting and transportation routes,and construction timing of municipal pipelines,and propose the construction steps for the DN1 200 water supply pipe to be synchronized with the shield tunneling main body and the later construction of power cables.At the same time,an analysis is conducted on the safety of municipal pipelines during tunnel construction.Measures such as setting maintenance valves,exhaust valves,and drain valves are adopted for the water supply pipes,and the tunnel wastewater drainage system is used to discharge water from the pipelines.Finally,research the fire safety measures for high-voltage power cable cabins to ensure the safe operation of tunnels and municipal pipelines.

shield tunnelexcess spacecomprehensive utilizationprocess layoutlifting constructionpipeline drainage

朱洁

展开 >

上海市城市建设设计研究总院(集团)有限公司,上海 200125

盾构隧道 富余空间 综合利用 工艺布置 吊装施工 管道泄水

2024

中国市政工程
上海市城市建设设计研究院

中国市政工程

影响因子:0.358
ISSN:1004-4655
年,卷(期):2024.(1)
  • 2