中国市政工程2024,Issue(5) :74-77.DOI:10.3969/j.issn.1004-4655.2024.05.016

深圳某水厂扩能改造期间不停水断管封堵技术分析

Analysis of Plugging Technology for Non-Stop Water Pipe Break During the Capacity Expansion&Reconstruction of a Water Plant in Shenzhen

王锋 徐奇
中国市政工程2024,Issue(5) :74-77.DOI:10.3969/j.issn.1004-4655.2024.05.016

深圳某水厂扩能改造期间不停水断管封堵技术分析

Analysis of Plugging Technology for Non-Stop Water Pipe Break During the Capacity Expansion&Reconstruction of a Water Plant in Shenzhen

王锋 1徐奇1
扫码查看

作者信息

  • 1. 深圳市水务(集团)有限公司,广东 深圳 518033
  • 折叠

摘要

老旧水厂在进行扩能改造期间不可避免涉及大口径供水管断管等工作,一旦水厂采取停水施工方式,则会对周边居民生活及企业生产造成影响.文章研究了深圳某水厂在扩能改造期间不停水断管封堵的技术方案,通过分析改造要求、确定大口径供水管断管位置、计算水厂储水能力、确定不停水断管封堵可施工时间、计算确定钢板分隔焊接方案等措施,最终采用多阶段实施的方式,实现了不停水断管封堵,将管道不停水断管封堵扩展至不影响水厂对外供水.管道封堵大致可分为如下阶段,阶段 1:开设人孔、管道内表面清理、测量实际断面;阶段 2:焊接钢板主次梁,用于后续钢板的固定;阶段 3:将钢板分为多块,每块需便于人工抬起焊接,并按由下至上的顺序进行焊接,完成封堵.

Abstract

During the expansion and renovation of old water plants,work such as cutting off large-diameter water supply pipes is unavoidable.If the water plant chooses to shut off the water supply for construction,it will affect the lives of surrounding residents and the operations of nearby business.The article explores a technical solution for non-stop water supply pipe blockage during the expansion and renovation of a water plant in Shenzhen.By analyzing renovation requirements,determining the location of the large-diameter water supply pipe blockage,calculating the water plant's storage capacity,establishing a feasible construction timeline for non-stop water supply pipe blockage,and devising a steel plate separation and welding plan,a multi-stage implementation approach was ultimately adopted to facilitate non-stop water supply pipe blockage.This method was extended to ensure that the pipeline blockage did not affect the water plant's external water supply.The pipeline blockage can be broadly categorized into the following stages:Stage 1:opening manholes,cleaning the inner surface of the pipeline,and measuring the actual cross-section;Stage 2:welding steel plate primary and secondary beams for subsequent steel plate fixation;Stage 3:dividing the steel plate into multiple pieces,each piece designed for easy manual lifting and welding,and completing the sealing in a bottom-up order.

关键词

老旧水厂/扩能改造/大口径供水管/不停水/断管封堵

Key words

old water plants/capacity expansion&renovation/large caliber water supply pipe/non-stop water supply/pipe cutting&plugging