Defects in Heating,Ventilation,and Air Conditioning System Inspection of Human Vaccine Manufacturers in Zhejiang Province
Objective To provide a reference for the regulation and industry development of vaccines in China.Methods The defects related to heating,ventilation,and air conditioning(HVAC)system in various official inspections of human vaccine manufacturers in Zhejiang Province from 2017 to 2021 were sorted out and analyzed,and the problems of vaccine manufacturers in the HVAC system were analyzed from the aspects of defect distribution and causes of defects.Results and Conclusion Vaccine manufacturers should improve their quality management system documents and strengthen personnel training,conduct scientific assessments and strengthen dynamic monitoring of environmental microorganisms,scientifically design plants,facilities and equipment,and carry out daily maintenance,implement biosafety-related requirements for the HVAC system in vaccine production workshops,and enhance the biosafety awareness of all staff.
heating,ventilation,and air conditioning regulation systemhuman vaccine inspectioninspection defectsbiosafetyZhejiang Province